These consisted of the basic separation plants near the towns of Micherdovka and Yachniki and the Kachanovski conditioning plant.
In 2003, Regal built new gas processing facilities, next to the existing Ukrnafta facilities at Yachniki. The initial plant capacity was 15.9 MMcf/d (450,000 m3/d) of gas and 370 bopd (60m3/d) of condensate. In May 2005, the MEX-GOL plant was expanded to incorporate additional gas and condensate handling and is designed to process sweet gas and hydrocarbon liquids. The facility has a gas processing capacity of 24.7 MMcf/d (700,000m3/d) of gas and 1,257 bopd (200m3/d) of condensate. The gas is evacuated through the Majestral international export pipeline to Western Europe. The condensate is loaded at the production facility and transported by road.
Regal's MEX-GOL processing facility handles the production from the five Regal-owned production wells (GOL-1, GOL-2, MEX-3, MEX-102 and SV-10).